Home EV Charger Installation

Fast, safe Level 2 charger installs with load calculations and a dedicated circuit.

What We Do

  • Load calculation and panel capacity review
  • NEMA 14‑50 outlet or hard‑wired EVSE
  • Neat routing, labeling, and testing
  • Permits and inspection coordination

Our Process

1) Assess

Evaluate panel capacity and charger requirements.

2) Install

Run wiring, install outlet or EVSE, and label.

3) Test

Verify charging speed and safe operation.

4) Inspect

Handle permitting and inspection where required.

EV Charger FAQs

Can my panel support a charger?

We calculate your available capacity and provide options including load management.

Do I need a permit?

Yes, and we handle it for you.

Get a QuoteCall